EV charger design for residences, condos & strata developments
From single-bungalow driveways to multi-block condominium car parks — we design open, tap-to-charge infrastructure that fits your building's power capacity, strata regulations and resident expectations.
Compact, wall-mounted chargers built for residential car parks
SkyVolt-branded chargers deployed at residential properties use a slim, wall or pillar-mounted form factor designed to fit tight residential bays without blocking pedestrian paths — with clear on-site instructions and open Tap & Charge access for any resident or guest, no app or account required.
Built for how Malaysian residential properties actually operate
Whether you're a management corporation, a JMC, a landed-home owner or a developer planning a new launch, residential charging comes with its own constraints — shared TNB supply, committee approvals, and residents who all want a bay near their unit. These are open, pay-per-use chargers any resident or visitor can tap and charge on — for a credit-restricted model limited to specific staff, see Employee EV Charging.
Condominiums & Gated Communities
Shared car park chargers with per-resident billing, allocated bays, and JMC/MC-facing reporting.
Landed Homes & Bungalows
Single or multi-unit installations sized to your existing electrical supply, with app-based control.
New Developments
EV-readiness built into the design stage — future-proofed distribution boards and bay provisioning for upcoming launches.
Everything from the first site visit to daily operations
Site Survey & Load Assessment
We assess your building's available power capacity and model traffic before proposing a layout.
ST-Compliant Electrical Design
New EV-DB installed to Suruhanjaya Tenaga standards, with Shunt Trip Emergency Stop, MCB and RCCB protection.
Tap & Charge, or App-Based
Residents and guests can tap a contactless card to charge instantly, or register on the SkyVolt app for usage history and completion alerts.
Idling-Fee Bay Management
An automatic idling fee discourages bay hogging, keeping shared bays available for other residents.
1. Initial Consultation
We discuss your property's layout, resident count and expectations.
2. Proposal & Commercial Terms
A tailored proposal covering design, timeline and the commercial model that fits your property.
3. Installation & Handover
Certified installation, testing, commissioning, and resident onboarding onto the SkyVolt app.
A model that fits your property, not the other way around
From fully client-owned installations to shared-investment and zero-upfront-cost models, we tailor commercial terms to your property's budget and bay count. Full pricing is confirmed during your free site consultation.
Considering EV chargers for your development?
Site assessment is free. We'll come back with a proposal designed for your property's power capacity and resident needs.